Onehunga Warehouse Strip-Out

Onehunga, Auckland8 weeks · 2024Confidential commercial developer
2,400 m²
Floor area
82%
Waste diverted
8 weeks
Duration
0
Incidents
Before & After

From hazardous to handover-ready.

Before
Warehouse exterior prior to demolition
Before — existing 1970s tilt-slab warehouse
After
Cleared warehouse site after demolition
After — site cleared to slab for handover
Toggle view
Warehouse exterior prior to demolition

Before — existing 1970s tilt-slab warehouse

Case Overview

How Sline delivered this project.

Sline was engaged to strip and deconstruct a 1970s tilt-slab warehouse adjoining a Category-B heritage façade. The programme required careful sequencing to protect the neighbouring wall while maximising landfill diversion under Auckland Council's Site Waste Management Plan.

Our Approach

  • Pre-demolition audit identified 14 recoverable material streams
  • Independent vibration and dust monitoring at the heritage boundary
  • Dedicated banksman on every vehicle movement onto Church Street
  • Weekly SWMP tonnage reporting shared with the principal
Site Gallery

Multiple points of view.

Documented views from across the programme — safety controls, plant movements and compliance milestones.

Structural strip-out mid-programme
Mid-programme — structural strip-out
Steel salvage sorted on site
Steel salvage segregated for re-melt
Concrete crushing on site
On-site concrete crushing to 40mm aggregate

Have a site with similar challenges?

Talk to a licensed supervisor about your project brief.