Cleared site ready for redevelopment
All Case Studies
Structural Demolition

Papakura Retail Block Takedown

Papakura, Auckland6 weeks · 2025Property owner — mixed-use redevelopment
3
Storeys
42 m
Frontage
6 weeks
Duration
0
Complaints
Before & After

From hazardous to handover-ready.

Before
3-storey retail block prior to demolition
Before — retail block between live tenancies
After
Cleared site ready for redevelopment
After — cleared to slab, party walls protected
Toggle view
3-storey retail block prior to demolition

Before — retail block between live tenancies

Case Overview

How Sline delivered this project.

A three-storey retail block on a busy arterial required takedown between two occupied tenancies. Sline delivered a controlled, party-wall-protected demolition with a fully approved Traffic Management Plan.

Our Approach

  • Structural engineer sign-off on demolition sequence
  • Continuous atomised water suppression on the excavator boom
  • Pedestrian gantry and covered walkway for retained frontages
  • Daily dust and noise monitoring against consent limits
Site Gallery

Multiple points of view.

Documented views from across the programme — safety controls, plant movements and compliance milestones.

High-reach excavator working the façade
High-reach with atomised dust suppression
Traffic management on the arterial
AT-approved Traffic Management Plan in place
Concrete crushing on site
On-site crushing to recover aggregate

Have a site with similar challenges?

Talk to a licensed supervisor about your project brief.